Connection of the facility to electric networks in Ukraine

...

Receiving technical specifications for connection.

...

Development of design and estimate documentation.

...

Execution of construction and installation works.

...

Signing of power supply contract.

...

Handover of deliverables and as-built documentation, pre-commissioning works.

Image

Our company is ready to perform technological connection of the facility to electrical networks. We provide services related to this activity, taking on all the troubles, starting from bureaucratic ones. We have highly qualified specialists, we have extensive work experience, the necessary modern equipment, permits and licenses. We are also ready to perform electrical fitting of any level of complexity, to do performance test of the electric network.

Technological connection is the connection of power receiving devices to electrical networks. Various categories of people go for such service: from ordinary citizens to entrepreneurs. You must apply to a grid operator for a technological connection. Meanwhile, it is recommended to follow clearly established procedures. The details are set out in the rules for technological connection, which are prescribed in the relevant government directive.

The service is in demand during the first commissioning process of the facility. It is also required if there is reconstruction with an increased power consumption. Technological connection is also performed when category of power supply reliability changes.
Peculiarities of process connection implementation.

Image

Особливості здійснення технологічного приєднання.

The procedure for technological connection of a facility to electrical networks is under different ways, depending on the specific situation. But there are general points, the applicant's requirements. The activity begins with an application. It is issued according to the established rules. An application is submitted to the grid operator. Which, in turn, provides technical specifications. They must be followed so that technological connection can be carried out without any problems.

The mandatory stage of cooperation is the drafting of a contract. One of the most important stages requires a comprehensive study. The competent specialists of our company propose draft agreements included compliance with all laws and regulations that will be favorable for both parties.

The technological connection of the facility to the electrical networks after the conclusion of the agreement goes to the most active stage. It is important for both parties to meet all the requirements that are put forward to them in the contract. Even as part of the activity, you should contact the the federal state energy review bodies. Since it is not possible to connect and commission the facility without the appropriate permission.

However, there are situations that are subject to an exception. For example, permits are not needed for legal entities and individual entrepreneurs who only need power in the range of 150-670 kW. At the same time, power supply sources are classified as the third category of reliability.

Image

Read more about the set of measures.

A very important stage in the technological connection is the preparation and providing the technical specifications by the grid operator. Sometimes they are developed by a power plant. But in any case, coordination with the grid operator takes place. Project documentation can already be developed based on technical specifications.

Projects are prepared by different parties. The applicant, for its part, is obliged to prepare papers which in details describe the work that will be carried out to perform the connection. In this design documentation, a land plot belonging to the applicant is drawn out. The documents shall comply with the specifications provided by the grid operator.

Sometimes the technological connection of the facility to electrical networks is possible, bypassing the stage of project development by the applicant. This is permissible in the framework of legislation on urban planning activities. Then the parties proceed to fulfill the technical conditions. The grid operator must carry out work related to the connection of power receiving devices, not forgetting about equipment that prevents emergency situations.

MAIN SECTIONS

Home
 

 

Contact information

Ukraine, 21001, Vinnytsia region, Vinnytsia, str. Heroes of the National Guard, bldg. 25

+38(050) 478 13 32

+38(050) 789 72 28

COPYRIGHT

© TEM ENERGY LLC, 2018-2025

© Website development "Master", 2021